News archive

Facade panels and interior walls made of fiber cement
(Special modified polypropylene fibers with high modulus) Construction towers project

Article
Effect of polyolefin macro fibers and handmade GFRP anchorage system on improving the bonding behavior of GFRP bars embedded in self-compacting lightweight concrete

Article
Impact of using different amounts of polyolefin macro fibers on fracture behavior, size effect, and mechanical properties of self-compacting lightweight concrete

Investigation of Micro and Macro Synthetic Fibers in Journal of Concrete Structures and Materials
Number 8

The 4th Asia International Expo of Transportation, Logistics and Related Industries
The closing ceremony of The 4th Asia International Expo of Transportation, Logistics and Related Industries was held on 17th December 2019 in the presence of the head of Science and Technology Vice-presidency and the National Elites Foundation Sorena Sattari. Sirjan complex was awarded by the Ministry of Roads and Urban Development of Iran as the best participant of the private sector for having the best performance in the Expo.

Sirjan complex in cooperation with Sirjan airport
Airport manager and security personnel with Iran Airports and Air Navigation Company civil engineer visited Sirjan factory. The role of Sirjan products and its new technology in improving asphalt pavement of airport runway quality was assessed according to the international standards.

Ministry of Energy project
Sirjan Modified Polyolefin fibers (600 MPa) based on mix design project have been used in constructing water canals of dam performed by Iran ministry of energy.

Sirjan Synthetic fibers in Iraq
Sirjan Synthetic fibers have been used as high modulus and high strength fibers in concreate pavement performed in Iraq by one of the holdings in Roads and Urban Development field.

Sirjan fiber reinforced concrete
Sirjan fiber (Kortta) (high modulus and high strength 650 MPa) has been used in one of the national BOT projects with foreign participation for all the culvert bridges in high-speed train line (400 km) with high fluctuations which has been confirmed by the foreign consultant.